None RP-34-100 Instalační příručka

Procházejte online nebo si stáhněte Instalační příručka pro ne None RP-34-100. none RP-34-100 Installation Guide Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk

Shrnutí obsahu

Strany 1 - Heating PEX-AL-PEX

INSTALLATION MANUALHeating PEX and Heating PEX-AL-PEX

Strany 2 - Contents

112. Determine Zone BoundariesBefore tubing is installed, visually inspect the area to determine the zoneboundaries.Thishelpsdeterminewherethe

Strany 3

125. Securing Tubing• When installing a thin slab over a subfloor, standard staples are used.• Make sure the staple gun is set to 100 psi (6.9 bar

Strany 4 - Expansion/Control Joints

13Insulation Requirements• A standard paper faced insulation can be used in the joist cavity.• Install the insulation tight against the subfloor to

Strany 5 - Installation Steps

14Under Floor Applications• Minimizes the structural load requirements often associated with light weight concrete (thin slab) construction.• Requ

Strany 6 - Location

154. Drill joists (if necessary)• Drill in accordance to structural requirements. To help keep the holes inline,itmaybehelpfultorstmarkthe

Strany 7

165. Install Tubing• Pull one end of the tubing from the unwinder and feed through the rstjoist.• Create a large loop with the tube and feed the

Strany 8 - 

172” (50.8 mm)Return ManifoldSupply ManifoldUnder Floor Layout ExampleHeating PEX or Heating PEX-AL-PEXHeat Transfer PlateFoil Faced InsulationInsulat

Strany 9 - 12" max

18HEATING PEX and Heating PEX-AL-PEX HEATING, COOLING, and SNOW MELTING LIMITED WARRANTYFrom Watts1. Watts warrants its Heating PEX cross-linked poly

Strany 10 - Thin Slab

815ChestnutSt.No. Andover, MA 01845ph: 855.699.2887fax: 978.794.1848radiant.watts.comIOM-Heating-PEX-and-HeatingPEX-AL-PEX1136

Strany 11

3General Handling & Storage1. If Heating PEX or Heating PEX-AL-PEX connections must be made in temperatures lower than 30.0°F (1.1ºC), caution mu

Strany 12 - MASTER SUITE

4 Standards and ListingsHeating PEX: –HeatingPEXismanufacturedtoASTMInternational(ASTMF876andF877)andtoSDR9dimensions.Thesestandard

Strany 13 - 2” (50.8 mm) air gap

5Slab-on-grade Applications• A common application consisting of any material or mass that encapsulates the radiant tubing, such as concrete, sand, o

Strany 14 - Ø 1-3/4"

612(304.8 mm)9(228.6 mm)6(152.4 mm)Tube Spacing• Residential slabs will use 6" (152.4 mm), 9" (228.6 mm), or 12" (304.8 mm) tube spac

Strany 15

73. Determine Zone BoundariesBefore tubing is installed, visually inspect the area to determine the zone boundaries. This helps determine where the fi

Strany 16 - Supply Manifold

86. Secure the Tubing• SecureallbendsandcornerstopreventHeatingPEXfromcurling, creating an unwanted high point in the circuit.• Leave 5&

Strany 17 - SNOW MELTING LIMITED WARRANTY

9Slab Layout Examples

Strany 18 - Materials and Tools Checklist

10Thin Slab over Frame Floor Applications• Most thin slab applications are installed during the initial construction of a building, due to the incre

Komentáře k této Příručce

Žádné komentáře